We're off to a very solid start, both figuratively and literally.

The figurative: 25 people came in during Set Saturday #1 - a tremendous showing! All of the directors are deliriously happy with the intrest that this show is getting from a technical stand point. Keep up the good work!

The literal: We completed the large goal of the day - building the solid deck support needed for the plant shop set. We built 7 individual stock size platforms and 2 custom platforms, attached legs, and connected them together, and then sheathed them with the flooring material to create the base section. We also started on the steps and the escapes, which was a bonus. Woot!

Take a look at this comparison of the design and a photo of the actual deck:




We'll add updates as we get them.

The Week Ahead:

Saturday, September 10th: Set Saturday #2: "There Will Be Walls." We'll use the same schedule as we did last week - start at 9:30 and end around 5:30. We'll have some things to paint later in the day, and we'll be setting up the walls of the plant shop. We'll also be building windows for the fire escapes, doors for the plant shops, and if we have the sort of crew next week that we had this week, we'll build the fire escapes as well. Aside from the Little Shop set, we'll also be preparing lights for the Homecoming Assembly. LOTS to do.

NOTE: Don't forget to sign up for the Homecoming Assembly duties: Set up is 2nd and 3rd hour Monday, strike is 4th - 7th on Tuesday.

Thanks for a great start to our busy drama season!